Concrete Driveway & Culvert for Stream

This project focuses on the repair of a driveway bridge over a stream on a residential property. Larger culverts are replaced underneath to optimize water flow. Rip rap rock along the sides of the creek bed prevents erosion. Existing wooden bridge is replaced by concrete poured bridge with rebar reinforcement.