Final preparations are made to the base, including adding stone and metal reinforcement, before pouring the concrete.
After the concrete is poured, the foundation is ready for the new garage build!The site visit includes marking the foundation layout and confirming final measurements for a precise build.The site is excavated to create a solid border and provide the depth required for a firm concrete foundation.Wooden forms are installed along the edges to maintain the shape of the footing and support the load distribution of the new structure above.The initial layer of concrete is poured, marking the next step in the foundation process.Once the concrete wall is in place, a drainage system is installed to protect the foundation and direct water away from the structure.