Site preparation included removal of old stand-alone building and the excavation for a new foundation for a large machine shed. Storm water from this site is contained in the adjacent pond where the bank was strengthened and a spillway added for controlled overflow.
Find more videos on the YouTube channel.
![Entire site overview overhead](https://www.bedrocksiteworks.com/wp-content/uploads/2021/08/prjEntireSiteOverheadViewQuakertown-805x453.jpg)
![Storm water overhead detail view](https://www.bedrocksiteworks.com/wp-content/uploads/2021/08/prjStormWaterOverheadDetailQuakertown-805x453.jpg)
![Finished grading and gravel driveway to new machine shed](https://www.bedrocksiteworks.com/wp-content/uploads/2021/08/prjQuakertownSitePrepComplete-805x453.jpg)
![Sun goes down on finished project](https://www.bedrocksiteworks.com/wp-content/uploads/2021/08/prjQuakertownSitePrepCompleteRoller-805x453.jpg)